This article introduces the installation sequence and skills of solid wood doors, the basic knowledge of solid wood door installation, and provides you with information on the installation of solid wood doors and how to supervise the installation of solid wood doors. The installation of wooden doors seems to be simple. In fact, this is not the case. This is a technical activity. Please read the patience of the readers. Don't miss a knowledge point. Know the installation order and skills of the wooden doors. It is a lifelong benefit for yourself.
Solid wood door installation knowledge
1. Installation conditions
(1) The solid wood door must be installed with a reserved opening. It is strictly forbidden to install the side wall.
(2) The solid wood door shall be installed after the installation of the groundwork (such as floor tiles and stone) of the hole, and after the wall putty is scraped and polished, the wall shall be covered with wall tiles and stone walls. Installation work can only be carried out on the side of the hole.
(3) The humidity of the installation wall is <25%. If the humidity is >25%, the moisture barrier should be installed on the installation wall.
(4) The installation site environment is clean, free of clutter, and no cross work.
2, the installation tool
Electric hammer, woodworking hoe, plane, flat boring, fine tooth saw (hacksaw), screwdriver, square ruler, tape measure, hanging hammer, level ruler, electric drill, hole opener, stamp, corresponding specification drill.
3. Installation materials
Iron piece connector, 60 nails, 25 and 20 self-tapping screws, 502 glue, towel or cotton yarn, wood cutting, small wooden strips, pig hair brush, styrofoam, milky white glue, door lock, hinge, door stopper, wall Body moisture material.
Solid wood door installation sequence
1, assembly door cover
First find the door cover and the vertical plate. According to the back number, the joints should be on the same plane, and the joints should be glued.
2, install the door cover
Put the assembled door cover into the door hole as a whole, and fix the door cover around with the small wooden strip. The two sides of the door cover should be on the same plane as the wall. Then check whether the whole door cover is perpendicular to the ground. The top cover and the two sides of the door cover Whether the two corners of the board are at right angles, whether the door panel is bent or not, and the iron pieces are twisted at both ends to wrap the wall.
3, install the door leaf
The hinge groove is opened first, and the distance between the hinge groove and the two ends of the door leaf is preferably 1/10 of the height of the door leaf.
4. Install the door lock.
After loading, check whether the door leaf and door lock switch are flexible, whether the seam is flexible, and whether the seam is in compliance with the specifications.
5. Install the door cover line.
Cut the door line with right-angled edges into a 45-degree angle, trim it with a woodworking planer, insert it into the door pocket at the right angle, and glue the door sleeve wire to the door panel with the floor glue.
6. Install the door suction at the corresponding position.
Solid wood door installation skills
When installing the solid wood door, first check whether the solid wood door components are complete, whether the dimensions of each component are correct, and whether the door is assigned to the corresponding position to match the door hole ruler.
The tips for installing solid wood doors are as follows:
1. Please place the goods horizontally on the floor, do not lean on.
2. Painted products should be painted within five days.
3, try to avoid long-term outdoor sunlight, to prevent solid wood doors from heating.
4. Maintain indoor air circulation to prevent frequent exposure of solid wood doors.
5, to prevent the solid wood door from being hit abnormally, it is not appropriate to use too much force when not closed.
6. It is strictly forbidden to hang heavy objects on the door.
7. Before installing the corner wall and T-wall door, the customer should be notified to make a “fake wall†on the side without the threshold. The width should be no less than 50mm. Determine the width of the “fake wall†according to the width of the line. Otherwise, the door edges displayed on both sides are asymmetrical.
8. The size of the single-swing door, the sub-mother door and the double-seat door opening is (the thickness of the sleeve is 32mm): the door height = the door height + 40mm, the door width = the door width + 65mm. Other types of composite doors are subject to specific conditions (note: the door height refers to the net height from the groundwork that has been completed, the width of the door opening, and the thickness is also the net size).
How to supervise the installation of solid wood doors
1, the mouth is consistently good.
2. The door leaf and door lock switch are flexible.
3. The gap between the door and the door is the same.
4, the door set vertical plate should be perpendicular to the ground, no bending phenomenon.
5. The door sleeve line is in close contact with the wall surface.
6, the decorative surface is not damaged.
7. Clean the set of solid wood doors after installation and teach the user to accept. [ Welcome everyone to pay attention to "Jiuzhengmen Window Network" WeChat public number: jiuzhengmenchuang attention to courtesy, scan code to send millions of business opportunities! ]
Blow Molding Screw Barrel,Molding Screw Barrel, Blow Screw Barrel,injection screw and barrel
Zhejiang Zhongsu Screw Co., Ltd. , https://www.zhongsuscrew.com