Bathtub installation 4 precautions

Things to be aware of when installing the bathtub:

(1) There is a slight gap between the bathtub and the wall. It is necessary to fill the gap along the wall brickwork. The upper plane of the brick is about 2 cm below the mouth of the bathtub, so that the tile is finally attached.

(2) The tiles of the bathroom should be laid after the bathtub is installed. After the wall is completed, install the bathtub. When installing, knock off the cylinder mouth, that is, the groove, which is convenient for inserting the upper mouth of the bathtub, and finally trimming, to prevent the bathtub from leaking when it is in use.

(3) After the bathtub drain pipe extends into the ground water outlet, the drainage test shall be carried out, and the waste water shall not be leaked.

(4) In order to stabilize the bathtub and extend the service life of the bathtub, it is recommended to put a glass glue on the place where the bathtub is in contact with the skirt and the wall, which can be effectively maintained, and the bottom of the bathtub is dry and prolongs the service life.  

PVC Spray Hose is widely used in high pressure industrial, compressors, service station and pneumatic tools. In agriculture, delivery pressure hose of pesticide, fungicide, fertilize solution also containing mineral oils for agriculture spraying. Material:
1.PVC(outer layer): Anti-UV Anti-aging;
2.Middle woven reinforced fabric: bending resistance,pressure resistance,anti-explosion;
3.PVC(Inner layer): low/high temperature resistance
Characteristics:
Being made of tough PVC materials and high tensile polyester reinforcement.
The Pvc Spray Hose is light,flexible,durable,anti-erosion,acid,alkali ,good flexibility and adaptability against climate.
Standard length: 50m, 100m
Temperature: -5℃ ~65℃

PVC Spray Hose

Pvc Spray Hose,High Pressure Spray Hose,Pvc Toilet Hose,Flexible Spray Hose

Hebei Jiuxing Rubber&Plastic Product Co., Ltd. , http://www.jxrubberhose.com

Posted on