Home Decoration: Wooden Grille Ceiling Construction Process

Wooden grille ceiling installation

The production of the wooden grille skeleton should be based on the accurate measurement of the roof size. The keel should be finished, the surface should be planed, the joint should be opened, and the horizontal and vertical keel joints should be opened with a half-groove joint. The flame retardant coating should be applied.

During the installation, according to the design, the elevation control line and the suspender installation line shall be popped. The wooden mold shall be drilled on the wall surface and the ceiling, and the ceiling hanging piece shall be fixed on the inner hook of the keel with a thick wire. When the installation is completed, the integral lifting method is adopted to move the wooden grille frame as a whole above the elevation line and connect it with the hanging piece on the ceiling. After all the hanging pieces are connected with the grille frame, the grille surface is leveled by adjusting the length of the hanging piece. After adjusting the grille frame to be level with the control line, fix the surrounding wooden keel to the wall. The surface treatment of the wooden grille skeleton surface is generally to paste more valuable wood thin pieces, install the lighting fixtures and close the decorative lines, the lamp base can be installed during the production of the wooden grille skeleton, and the power is turned on after the hoisting. The grille frame trim strips should be installed on the ground, and the ceiling installation should be followed by a closed line seal. After the wooden grille is installed, it is necessary to apply a clean oil coating to the finish, and then install the frosted glass after brushing.

Estimated duration of wooden grille ceilings

The wooden grille ceiling is a relatively labor-intensive and complicated project, involving many materials, preparation and production time is longer. After the installation, the surface paste, surface brushing, and glass installation need careful operation, detailed construction, and more man-hours. The technical level is higher. The wooden grille ceiling is about 15 square meters. It takes about 10 days from the start of stock preparation to the completion of the work. The dragon skeleton is processed and manufactured for 2 days. The stock preparation and installation are 2 days. The decorative decoration is 3 days. Others are waiting time for the craft. Intersection with other woodworking or parallel operations. The duration will vary depending on the degree of structure and the use of materials.

The effect of wooden grille ceiling

The wooden grille ceiling is different from other ceiling projects and should be attributed to the joinery decoration. The wooden grille ceiling is a method that is commonly used in home decoration corridors, entrances, restaurants, and large roof beams.

Wooden grille ceiling can not only beautify the top, but also can achieve the purpose of adjusting lighting and increasing the overall decoration effect of the environment. It requires generous design, reasonable structure, beautiful appearance, firm fixation, smooth surface, uniform color, scientific layout of internal lighting, complete paint finish, no scratches, no pollution, etc.

Aisle ceiling living room ceiling decoration glass lighting decoration design home decoration process glass grille restaurant ceiling

Extruded Strips

Extruded Stips,Pvc Sealing Strip,Window Seal Strip,Door Seal Strip

Wuxi Jierui Changkun New Material Technology Co., Ltd , https://www.jrck-plastic.com