How to renovate a new house

After the purchase of a new house, people are excited and worried. The excitement is that they finally have their own house, and they can decorate their house according to their own wishes. What is embarrassing is that they do not understand the new house decoration process and it is easy to error. If you are not an expert on the decoration, it is recommended to find a decoration company to do it. If funds are not sufficient, it is recommended to refer more to other people's plans and design by yourself. This can save design costs. If you are interested in how to refurbish a new house , let me know about it!

How to Renovate a New House Step 1: Volume Design

Regardless of the new house or the old house, the first step before the renovation is to conduct a detailed measurement of the house to clarify the size, area, and placement of furniture and appliances involved in the decoration process, such as the tiling area, the top wall paint area, Wallpaper area, floor area, etc. After the room is measured, the design can be started, the design style of the house can be determined, the difficulties in the design can be analyzed, and the required number of main and auxiliary materials for decoration can be calculated.

How to Renovate a New House Step 2: Main Body Removal

After the design is completed, after the contractor and the owner sign the contract, they begin to enter the construction phase. This may be due to the poor space structure of the house, involving major demolished projects, such as wall removal, wall cladding, shoveling of wall coverings, demolition of heating, and replacement of steel. Window etc.

How to Renovate a New House Step 3: Hydroelectric Reform

After the demolition of the main body is completed, it is possible to enter the hydropower reform phase. In the middle, the kitchen can be measured to determine the approximate dimensions of the cabinet. Since the wall surface has not yet been processed, the main purpose is to check whether the positions of the reserved water inlet, water meter, and range hood are checked. reasonable. After the completion of the hydropower reform, it is followed by kitchen and toilet water treatment, especially bathroom waterproofing.

How to Renovate a New House Step 4: Carpentry - Bricklayer - Oil Worker

After the acceptance of water and electricity is passed, carpenters, bricklayers, and oil workers can begin to enter the arena. These three links are called the “three brothers” in the construction process. The basic principle is who is dirty and who is on top of it. The basic appearance sequence is: Carpentry - Bricklayer - Oil workers. Woodworking mainly includes ceilings, wooden doors, furniture, etc. Woodworking operations should pay attention to size, material selection and painting. Bricklayers include wall and floor tiles, passstones, and marble windowsills. After the completion of the carpentry and bricklayers, it is possible to start the oilwork process. The oilworkers mainly include grassroots processing, brush finishes, and furniture paintings. If the wall is ready for special wallpaper, the wall oiler only needs to perform the primary treatment.

How to Renovate a New House Step 5: Kitchen Ceiling and Cabinet Installation

After the completion of the oil industry, the hard-decoration part of the decoration was basically completed. At this time, the installation stage was completed. Kitchen ceilings, including moisture-proof ceiling lamps, exhaust fans, and Yuba, are best done in one go. The cabinet installation involves the sink and the gas stove. Before the installation, the property must be contacted to pass the gas. After the gas stove is installed, the gas test is required.

How to Renovate a New House Step 6: Wooden Door Installation

Wooden doors need to be booked in advance and are usually measured together with window covers and cornices. After the cabinets are installed, wooden doors can be installed. The hinges, door locks, and suction hardware fittings must be installed together.

How to Renovate a New House Step 7: Floor Installation

After the wooden door is installed, you can proceed to install the floor. Make sure that the floor is flat, clean, and dry before installing the floor. When the floor is installed, shrink joints should be reserved, except for about 1cm floor expansion joints between the floor and the wall. The gap between the floors must also be reserved, generally not more than 1mm. When floors with higher density are laid, each block should have a gap of 0.4mm to prevent future arch deformation.

How to Renovate a New House Step 8: Wallpaper Paving

After the floor has been installed, the entire house will be thoroughly cleaned once to keep the interior clean and the floor protected. Before applying the wallpaper, it is best to apply a layer of polyester paint on the wall to prevent the dampness and mildew of the wallpaper. When laying, it is necessary to prepare a clean towel to clean up the lot of glue. After paving, the wallpaper should be kept dry and well ventilated.

How to Renovate a New House Step 9: Radiator Installation

After the wallpaper is pasted, you can follow the radiator, which is the principle of who is the first to follow the dirty, wooden doors - floor - wallpaper - radiator is generally recognized as the installation sequence.

How to Renovate a New House Step 10: Switch Sockets, Lighting Installation

When the owner is renovating, the number and position of the switch sockets in each space must be clearly pointed out so as to prevent the workers from forgetting to leave blank labels in the wallpaper paving, and all of the wallpapers will be pasted on the whole. Equal to the installation of lamps and lanterns to pay attention to safety, it is best to turn off the power off before installation, check the power after installation.

How to Renovate a New House Step 11: Install Hardware Ware, Curtain Rods

The hardware sanitary ware includes sinks, faucets, locks, upper and lower water pipe fittings, toilets, drying racks, etc. It is necessary to pay attention to the matching of the models before selecting, and it is better to purchase a set of the same brand to avoid losses. Then the curtain rod can be installed. Before the curtain rod is installed, the installation position must be determined first. The installation height and width. The width of the curtain rod can be determined by the width of the window, which is 20-30 cm more than the width of the window. The installation height of the curtain rod is different from the clear rod and the dark rod. The installation height of the rod is in the middle position between the ceiling and the window frame, and the dark rod is installed on the top of the curtain box or on any side of the curtain box.

How to Renovate a New House Step 12: Entering Furniture, Appliances

The earliest furniture and home appliances can be purchased after the completion of the hydropower reform, and the sizes can be basically determined. Once the furniture is placed in the room, the entire space will instantly bloom.

How to Renovate a New House Step 13: Home Accessories

After furniture and appliances are laid out, curtain fabrics, decorative paintings, craft ornaments, green plants, etc. can be considered, and the space can be full of human touch. Of course, these items can be slowly selected later!

Editing summary: The above is how to decorate the new house related knowledge introduction, the new house decoration order is each owner more or less to understand the small common sense, correct understanding can be better after the home decoration. The order of decorating the house is generally from high to low, from inside to outside, this is the most basic decoration order. For more home improvement related content, please pay attention to this site, or you can visit this site under the line of experience directly consulting.

How to decorate a new house

Laser Digital Detector for Guide Rail

  1. Laser Digital Detector for Straightness and Torsion Resistance of Elevator Guide Rail

  2. Detector for Elevator Guide Rail Geometric State

  3. Laser Detector for Elevator Guide Rail Coplanarity

  4. Laser Corrector for Elevator Guide Rail Installation

  5. Laser Detector for Elevator Guide Rail Verticality

  6. Laser Detector for Coplanarity of Distance Between Guide Rail


We carry high quality Laser Digital Detector for Guide Rail for all major elevator and escalator brands

for OTIS Elevators, ThyssenKrupp Elevators, Schindler Elevators, KONE Elevators, Mitsubishi Elevators, Fujitec Elevators, Hitachi Elevators, Toshiba Elevators, Fuji Elevators, Express Elevators, Sigma Elevators, LG Elevators, Hyundai Elevators, BLT Elevators, CANNY Elevators, SJEC Elevators, KOYO Elevators

Laser Digital Detector for Guide Rail, Detector for Elevator Guide Rail, Laser Detector for Elevator Guide Rail, Laser Corrector for Elevator Guide Rail

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjfullelevatorreplacement.com

Posted on