2018 latest and most standard wall construction contract model


Whether wall construction or renovation team to find the decoration company will need to sign a contract fence construction, fence construction contract to find a model is a very troublesome thing, the decoration of the following Xiaobian home decoration 2018 will bring you the latest and most standard wall construction model contracts, this contract template only for your reference.


围墙施工合同


Wall construction contract template

Party A ( full name ) :

Party B ( full name ) :

In accordance with the "Contract Law of the Chinese Republic of China", the "Building Law of the People's Republic of China" and other relevant laws and administrative regulations, and the principles of equality, voluntariness, fairness and good faith, the two parties have reached a contract for the construction project.

I. Project Overview

project name:

construction place:

Second, the scope of project contracting

Contracting content: Pingji earthwork excavation and filling, stone blasting and excavation, retaining wall masonry, permanent wall masonry.

Third, the contract period

Total contract days for contract duration: Calendar day

Fourth, quality standards

Engineering quality standards: Meet the current national acceptance criteria and the design drawings required by Party A ( see the attached drawings for the wall design drawings ) .

V. Contract price

This contract adopts the unit price package price: 1 , Pingji earthwork excavation, filling, transportation 25.00 yuan / m3 ; 2 , stone blasting and excavation 60.00 yuan / m3 ; 3 , retaining wall masonry 290.00 yuan / m3 ( contractor package materials, including pointing); 4, permanent masonry walls 500.00 yuan / m (labor and materials containing 600mm wide, 500m deep pulp, puzzle rubble base, deep base portion ultra calculated 290.00 yuan / m ³) . The above unit price includes tax.

6. Project quantity confirmation and project payment

1. Confirmation of engineering quantity: According to the actual amount of the receiving party on the site, the confirmation of the two parties shall be subject to the confirmation. If the amount of work is confirmed beforehand, Party B shall promptly apply for visa to Party A.

2 , project payment: 80% of the amount of work completed per month to pay the progress of the project, the remaining 20% to be paid within one month after the completion of the project acceptance.

Seven, material equipment supply

1. Party A supplies materials: Party A does not supply materials.

2. Party B's supply materials: All materials shall be purchased by Party B, and the procurement materials shall provide product certification and relevant quality certification documents as required.

8. General rights and obligations of both parties

1. Party A's work

1.1 . Supervise the quality, progress and safety of the project ;

1.2 . Acceptance work for each process in the project ;

1.3 . Provide construction drawings and related technical materials and technical guidance to Party B ;

1.4 . Determine the level point and coordinate control point .

2 , Party B work

2 .1 , subject to the management of Party A ;

2 .2 , provide Party A with proof of quality of all materials ;

2 .3 . Obey the relevant regulations on safety construction of engineering construction, organize construction strictly according to standards, and take necessary safety protection measures to eliminate hidden dangers. All liabilities and expenses caused by a safety accident during the construction process shall be borne by Party B ;

2 .4 , carefully follow the requirements of standards, specifications and design drawings and the instructions issued by Party A according to the contract ;

2 .5 , do a good job in the coordination of the acceptance of the various procedures, to facilitate the inspection and acceptance ;

2. 6. Do a good job in civilized construction work, ensure that the construction site is clean, and bear the losses and fines caused by violation of relevant regulations for its own reasons.

IX . Liability for breach of contract

1. The quality of the project should meet the quality standards agreed in the contract. Due to Party B's reasons, the quality of the project does not meet the agreed quality standards, and Party B is liable for breach of contract.

2. If the quality of the project does not meet the quality requirements, Party A has the right to request the dismantling and re-construction. Party B shall bear the cost of dismantling and re-construction, and the construction period will not be postponed.

3. For reasons of Party B, it is not possible to complete the work period scheduled according to the agreement , and deduct the compensation fee of 1000 yuan / day. If the amount of engineering increases, according to the amount of engineering increased, the national fixed period will be postponed accordingly.

4. Party B has the right to clear Party B due to Party B's disobedience management, and Party A has the right to clear Party B. All losses caused by Party B shall be borne by Party B.

X. Party B promises Party A to carry out construction and completion according to the contract and undertake the project warranty responsibility during the quality warranty period.

XI. Other unfinished matters shall be resolved by on-site consultation between Party A and Party B.

Twelve, annex: drawing page.

Thirteen, this contract is in quadruplicate, and B sides armed with two copies. The two parties will take effect after signing and stamping.

Contract signing time: year month day

Employer: ( Official seal ) Contractor: ( Official seal )

Legal representative: Legal representative:

Delegated representative: Delegated representative:

phone: phone:


The above is what Xiaobian brought to you. 2018 latest and most standard wall construction contract model I believe that everyone has a basic understanding of the wall construction contract after reading this article . If you want to know more about the decoration consultation, please click to enter the decoration knowledge channel !