11 items to be installed in the shower room

The recent bursting of the shower room has caused a lot of people's attention. However, according to professionals, this is a small probability event and does not have universality. Today, Xiaobian will give you a list of precautions for installing a shower room.

1. The pre-buried hole size of the shower room should be designed before the bathroom is not renovated. The wiring leakage protection switch device should be considered before installation in the shower room to avoid rework;

2. After the packaging of the shower room is opened, please place the glass vertically against the wall. If it is placed horizontally or unevenly, it may cause damage to the glass, resulting in property damage or personal injury.

3. When transporting, the horizontal movement of the shower room is easy to break the glass, and it must be vertical and transported by two or more people at the same time;

4. Burning flames such as cigarettes will damage the spray or glass. Please keep away from the fire source and avoid contact with strong organic solvents such as benzene, paint and paint cleaner. If accidental contact may cause surface softening and dissolution, the quality of the product will be endangered. Phenomenon occurs;

5. Acrylic products begin to soften when heated to 100 ° C, so avoid storing or using them in high temperature environment of 80 ° C or above;

6. It is strictly forbidden to wipe with decontamination powder. The decontamination powder will corrode the surface and reduce the smoothness of the surface;

7. Use clean water or neutral detergent to clean the surface of the product. For stains that cannot be removed, use a cleaning cloth soaked with a small amount of alcohol to remove the stains;

8. Anti-seepage treatment of the wall: The wall of the rough house of the real estate company is not treated by waterproofing. Before the tile is placed, a layer of anti-seepage cement should be scraped before the tile is applied. After the tile is finished, it should be decorated. The workers process the wall joints of the tile joints, so that the water in the bathroom can be prevented from penetrating into the outer wall through the brick joints, so as not to suffer from the troubles.

9. Disposal of Drainage and Floor Drain: Because the bathroom should be deodorant and preventive of infectious diseases, the state must have a concave pond gooseneck design when building, and the first floor drainage should be placed on the bathroom floor, but once the water passes through the ground or water supply The pipe seeps through, the entire toilet pocket will be filled with dirty water, and the water will not penetrate or cross the wall into the corner of the room or into the lower layer. Therefore, at the bottom end of the concave pool, a secondary drainage pipe should be set up, and the floor cement should be scraped with anti-seepage cement on the ground. If the home is installed with the primary and secondary drainage system, many troubles will be avoided in the future.

10. When using sealed silicone, do not apply silicone to the surface of acrylic sanitary ware. If you accidentally apply a little, don't rush to wipe, it is more difficult to remove, should be gently removed after curing, it is strictly prohibited to scratch with a hard object, otherwise it will cause surface damage. After the bottom basin is installed, it should be used after the silica gel is completely cured (silica gel curing time is 24 hours);

11. The appearance of the shower room should be neat and bright after installation. The sliding door and the sliding door are parallel or perpendicular to each other. The left and right symmetry and sliding door should be opened and closed smoothly, without gaps and water seepage. The shower room and the bottom basin are sealed with silicone rubber;

Acceptance criteria for shower room installation:

Check size: Check for errors between the measured size and the actual product size.

Check level: The error should be controlled within 2mm/1000mm.

Check vertical: The horizontal error of the upper vertex and lower vertex on both sides of the shower room should be controlled within 10mm.

Check silica gel: silica gel should be thin, uniform and beautiful.

Check the suction: the gap of the magnetic door suction strip should be symmetrical, the opening and closing should be flexible, and the opening and closing force should be between 15-40 Newtons.

Check the hinge: the hinge should be smooth and free of noise when opening and closing.

Industrial Sectional Door

Industrial sectional doors are the most durable and longest lasting doors to ensure circulation at the areas of the factory entrance and exit of goods, loading and unloading areas.

The body of sectional door is forming by 40 mm sandwich panels. These panels provides sound and heat insulation due to the intense doped polyurethane insulation was injected between galvanized steel sheet. (50 kg/m3).

Industrial sectional door systems provide space-saving with opening parallel to the ceiling.Any opening can be used clearly . and produces in accordance with the transition range and the height in the factory buildings or warehouses.

Doors is working sliding by be the most appropriate the gap between the top level of the gate with a ceiling height within the side rasils. The door can be mounted in different ways according to the gap distance (standard, low, highlift and vertical track systems).

Industrial sectional doors can easily be opened automaticly by 230-380 V-AC/50 Hz electric motor or manualy thanks to torsion spring system that balances the weight of the door.The galvanized springs are made to be durable of 25.000 door cycles.Motor with emergency chain All the drive systems have a mechanical back-up system fitted to the reduction gearbox of the electric motor, so that the sectional door can be opened if the power fails. The reduction gearbox can then be powered using the chain.

Industrial Sectional Door,Industrial Overhead Sectional Door,Industrial Warehouse Sectional Door,Industrial Garage Interior Sectional Door

Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hffreezerdoor.com

Posted on