12-step renovation steps to replace the rough room with “new clothes”


The year is approaching, and many owners have bought new houses. They have to start thinking about how the new house should be renovated. However, according to Xiaobian, few people should know the process of roughing the house. Let's take a look at the renovation steps of the rough room together with Xiaobian .


According to the data of the renovation process of the rough house collected by Xiaobian, there are about nine steps in the renovation of the rough house:


The first step is to measure the area, size, and height of the building; understand the structure of the building, know which are the load-bearing walls, and which are the non-bearing walls; check whether the waterproofing of the house is up to standard.


The second step is to choose the decoration company, go to the house site to view and actual measurement together with the staff of the decoration company, express their own decoration ideas to the decoration company, and determine the decoration plan.


The third step, after the decoration plan is determined, choose the Jiri decoration construction team to enter the market.



毛坯房装修步骤

 




The fourth step is the demolition of the main body of the house. In some houses, the owner feels that some part of the structural design will cause inconvenience to the future life, and will require appropriate rectification. The main body of the demolition mainly includes demolishing walls, building walls, dismantling heating, and changing windows and doors.


The fifth step, hydropower transformation, is a concealed project. It is best for the owner to go to the site for supervision, so that it is troublesome to find the problem later. Hydropower transformation must be of high standards and strict requirements, and quality must be absolutely guaranteed in both materials and construction. To accurately specify the specific location of lamps, switches, sockets, water heaters, washing machines, etc.


The sixth step, the woodwork enters the field, the main content of the work is the package riser, decorative ceiling, plaster line, door cover and so on. The package riser is generally packed with light steel keel or wooden keel, which not only acts as a moisture barrier, but also makes the pipe look more beautiful.


In the seventh step, the bricklayer enters the scene. Before the bricklayer sticks the floor tiles, it is necessary to do the floor drain, waterproof, and pull the hair before starting to stick. Note that the floor drain should be protected against corrosion and deodorization.


In the eighth step, the oil workers entered the scene. To paint the wall, first level, putty, polish, roll or spray. If the woodwork is painted on the surface, it must be adhered to the bottom of the large core board.


The ninth step, the kitchen and bathroom ceiling, installation of cabinets, sinks, doors and windows, floors and so on.



毛坯房装修步骤



The tenth step, paste the wallpaper, after the paste, do not open the door and window ventilation for 48 hours, let it dry slowly.


In the eleventh step, install the lamps, switches, sockets, water heaters, curtains, etc. according to the previously determined location.


In the twelfth step, clean the house and try to clean every corner. After the cleaning is complete, the furniture comes into play and you can stay.


As can be seen from the above, the renovation steps of the rough house will be more complicated, because it has no other things besides the structure of a house, all of which must be completed by the later decoration. Therefore, for the owners who purchased the rough house, it is very necessary to understand the renovation process of the rough house.

Metal Trash Can

Metal Trash Can,Metal Bucket Trash Can,Trash Can With Lid,Galvanized Trash Can With Lid

xiacun factory , https://www.xiacunmetal.com

Posted on