Installation and Maintenance Instructions and Safety Requirements for Driving Lines

First, according to the scene of the trolley line, this article uses the trolley line as an example. After the trolley line is purchased, it is installed according to the manufacturer's instructions. The angle bracket is welded or fixed to the rail under the 1.25m distance.

Second, the collector installation, the current collector bracket welding in the standard position of the traffic, the collector penetrates the collector bracket, and adjust the collector and the trolley line parallel distance.

3. After fixing the angle bracket, install the lifting bracket and the fixing bracket below the angle bracket.

Fourth, after the traffic trolley wire is fixed under the lifting rack and the fixed frame, and the power input, the aluminum joints of the connection points of the trolley wires are installed, and then the joint jacket and the ends are installed.

1. Installation instructions Before installing the trolley wire, firstly install the angle bracket according to the installation type selected by the user and fix it according to the hanging distance of the trolley wire. Put the required one on the slippery wire every 6 meters at the installation site. Suspension seat, and one end of the two joints jacket, one end is equipped with an aluminum connector, when installing aluminum joints, it should be noted that only the aluminum rail can be extended into the joint 1/2 for another rail connection, the above work When ready, hang a single wire on the bracket and make a full wire connection. Tighten the screws of each connector when connecting. When the total length of the trolley line exceeds 200 meters, a telescopic device (television equipment supplied at any time) should be installed. When the power cable is connected, it can be connected at every 6 meters of joint. The specific connection method can refer to the front Connector device diagram.

When installing a curved trolley line, the suspension distance should be shortened accordingly. The specific dimensions can be determined according to site conditions.

When installing the conductive device, the conductive device is first installed on the matching square tube, and the appropriate position matched with the trolley line is selected to be fixed on the electrical equipment. Care should be taken to ensure that the conductive device and the trolley line have good tracking performance. With good contact ability, the conductor and trolley wire should be installed in the same vertical and horizontal direction.

2. Maintenance The safety wire contact line should be checked regularly during normal operation, because the power equipment is the main production tool of each industrial and mining enterprise. A slight error will directly affect the production efficiency of the factory. When checking the trolley wire, check whether there is any looseness and disengagement at every 6m. When checking the conductive device, check whether the movable part is flexible, whether the tension spring is fatigued, the brush is worn, etc. (These conditions will affect To track the conductive properties and the tracking performance of the conductor should be adjusted in time).

During the renovation of holiday equipment, the conductive device is pulled out of the catheter and the brush roller of the conductive device is inspected for wear. If the brush is less than the specified effective length, it must be promptly replaced. When the guide roller is deformed seriously, it must be replaced to maintain the conductive device. Run normally and brush well and check the cause. Safe slide wire In all parts, the brush is the only part that will normally wear out.

Safety requirements for traffic trolley lines a: When the trolley lines are in use, try to avoid excessive contact with other live parts. Keep a certain safety distance.

b: If the equipment that is powered by the trolley wire is not heavily loaded and the current is too low, use protective devices such as grounding and zero connection for the trolley wire.

c: At the place where the trolley line is installed, a safety sign should be set at the place of use so as to prevent other equipment and personnel from exerting heavy pressure on it, causing the shell to burst and causing a safety accident.

d: If the device using the trolley wire is overloaded and the current is too large, the voltage of the trolley wire may be too strong. Install a lightning protection line, protection gap and other voltage protection equipment in the place where the trolley wire is used.

e: When the trolley wire is used outdoors or indoors at a person's centralized place, strict protective measures should be taken around it to prevent the surface of the trolley wire from being damaged and the leakage at the interface causing a safety accident.

f: Although the special type of trolley wire has the characteristics of high strength corrosion resistance, wear resistance, heavy pressure resistance, high temperature resistance, etc., it can be used normally in harsh environments, but it cannot be protected for the second time because of its own characteristics. If the trolley wire is used in harsh environments, secondary protection should be provided to prolong its service life.

Driving trolley line: After the equipment is installed, it is necessary to prepare the sliding line for commissioning. Use special equipment to keep the angle brackets parallel and the sliding lines do not bend. After that, the power test runs.