Check before installation of the lift


When the lift manufacturer is installing the lift, the following checks should be made:
1. Review the foundation of the foundation. The foundation of the construction elevator must meet the requirements of the product manual. The foundation is set on the roof, floor or other lower suspended structure of the basement, and the bearing capacity of the finished structure shall be calculated. When the finished structure can not meet the bearing capacity requirements, reliable reinforcement measures should be taken, and the experience can be installed before being qualified.
2. The lift manufacturer should check the attachment point of the attached wall frame. The strength of the building structure at the attachment point of the attached wall frame shall meet the requirements of the construction manual for the construction of the lift, and the embedded parts shall be reliably embedded in the structure of the building.
3. Drink tea structural parts and parts. Before installation, check whether the structural parts such as the rail frame, cage, fence, sky wheel and attachment frame of the construction elevator are intact and matched. The types and quantities of bolts, shaft pins, cotter pins and other components are complete and intact. Visible, severely rusted, heavily worn, wholly or partially deformed components shall be repaired or replaced until the relevant provisions of the composite product standard are available for installation.
4. The lift manufacturer should check whether the safety device is complete and in good condition.
5. Check the rust and lubrication of the link parts of the parts. Check the rust and lubrication of the socket pin and pin hole of the rail frame, struts, fasteners, etc. to ensure that the parts are oiled and rust-proof, and the mixing parts are fully lubricated and flexible.
6. Check the special power supply and distribution box, auxiliary lifting equipment, slings and tools required for the installation work to ensure that the installation requirements of the elevator are met.
All items are inspected and all are accepted before they can be installed.

This article is from: http://

Lab Heating Cooling Circulation Bath

Lab Heating Cooling Circulation Bath will refer to lab heating cooling machine and it is always equiped with lab Jacketed Glass Reactor for heating and cooling unit . The maximum temperature will be heated up 200c and minimum temperature as client request .

Heating cooling machine can be named as lab heater cooler for all kinds of chemical reactos

Laboratory Cooling Cycle,Laboratory Heating Cycle,Laboratory Circulation Machine,Heating And Cooling Circulation System

Zhongyi Kori(Zhengzhou)Equipment Co.,Ltd , https://www.korireactor.com

Posted on